Glass fibre production equipment OSP6

Equipment delivery set
Glass sludge crusher

Crusher control panel

Washing of glass sludge with vibrating screen

Vibrating screen control panel

Primary yarn drawing equipment
  • Main electrical switchboard
  • Electrical installation kit
  • Electrode for electric melting furnace
  • Electric switchboard
  • Die feeder platform
  • Control unit
  • Winding machine for pulling fibre and producing the primary bundle.
  • Protective cover of the winding machine.
  • Oiling device
  • Die feeder (annual stock 24/7)

System for preparation of oiling composition
(reverse osmosis system, large mixer, oil mixer (3 pcs.), control panel)

Coil rewinding kit
  • Roving machine
  • Stand for primary bobbins
  • Electric switchboard

Packing machine
Spare parts kit
(annual stock):
Worm gear (set of 2 pcs.) (winder)
Worm shaft (winder)
Fixing kit (winder)
Toothed shaft (winder)
Primary yarn unwinding jar (winder)
Roving slider (roving machine)
Toothed belt (roving machine)
Electric motor of the oiling device
Yarn bundle rollers (graphite)
Control unit
V-belt (rewinder)
Pulley (winder)
Axle (winder)
Layout box drive assembly (winder)
Bushing (winder)
Fasteners (winder)
Nylon sleeve (winding machine)
List of works
Chief supervisor for the installation of the base of the glass melting complex
Installation supervision of the oiling compound circulation system
Supervision of the installation of the drying chamber
Chief supervision for the production of primary bobbin carts
Project preparation (set of drawings), development of construction plans
Formulation of oiling compositions for K-ARMA straight roving
Chief supervision of equipment installation, supervision of equipment commissioning
Personnel training (2-4 persons, at least 40 hours), consultations on technological issues, energy saving, quality control of the output products
Have a question?