from 200 sq.m. - industrial, from 100 sq.m. - warehouse;
Water supply;
Energy consumption: from 130 kWh;
Level concrete floors;
Ventilation.
Conclusion of equipment purchase and sale agreement and service agreement;
Production of equipment and preparation of the customer's premises;
Mounting of equipment;
Staff Training.
The total duration of the works is 4-6 months.
Terms of payment: 70% prepayment, 30% when the equipment is ready for shipment to the customer.
Individual approach to each client.
We are ready to calculate equipment configurations at the customer's request.
Our company has implemented a number of projects to launch production facilities in Russia and the CIS (Kazakhstan, Uzbekistan, Turkmenistan, Kyrgyzstan).
Equipment delivery set
Glass sludge crusher
Crusher control panel
Washing of glass sludge with vibrating screen
Vibrating screen control panel
Primary yarn drawing equipment
Main electrical switchboard
Electrical installation kit
Electrode for electric melting furnace
Electric switchboard
Die feeder platform
Control unit
Winding machine for pulling fibre and producing the primary bundle.
Protective cover of the winding machine.
Oiling device
Die feeder (annual stock 24/7)
System for preparation of oiling composition (reverse osmosis system, large mixer, oil mixer (3 pcs.), control panel)
Coil rewinding kit
Roving machine
Stand for primary bobbins
Electric switchboard
Packing machine
Spare parts kit (annual stock):
Worm gear (set of 2 pcs.) (winder) Worm shaft (winder) Fixing kit (winder) Toothed shaft (winder) Primary yarn unwinding jar (winder) Roving slider (roving machine) Toothed belt (roving machine) Electric motor of the oiling device Yarn bundle rollers (graphite) Control unit V-belt (rewinder) Pulley (winder) Axle (winder) Layout box drive assembly (winder) Bushing (winder) Fasteners (winder) Nylon sleeve (winding machine)
List of works
Chief supervisor for the installation of the base of the glass melting complex Installation supervision of the oiling compound circulation system Supervision of the installation of the drying chamber Chief supervision for the production of primary bobbin carts Project preparation (set of drawings), development of construction plans Formulation of oiling compositions for K-ARMA straight roving Chief supervision of equipment installation, supervision of equipment commissioning Personnel training (2-4 persons, at least 40 hours), consultations on technological issues, energy saving, quality control of the output products